Telecoms & Data

EE Bristol BDP Phase 2

This project consisted of the installation of new LV switchgear, three 200kW UPS Modules, a new DC power plan and associated battery strings for DC and UPS equipment.

Client:Everything Everywhere
Contractor:DBS
M&E Value:£800 Thousand
Completion Date:December 2020
Mechanical Scope of Works
  • Installation of 2x new Vertiv chilled water cooling units
  • Provision of 3x EC fan upgrades to existing cooling units in perimeter plant corridor
  • Install new Vesda air sampling pipework to 2x new RACU’s
  • Re-instate chilled water pipework to existing RACU including pipework freezing of existing ring main
  • New stainless steel chilled water pipework to new cooling units
  • Thermal insulation to chilled water pipework
  • Modification to existing water leak detection system to pick up new cooling units in plant corridor
  • Installation of black powder coated cable tray containment system in switch room floor void to feed DC distribution cabinets
  • Builders work holes for pipework cabling & containment including firestopping
  • Re-decoration of walls in power room & switch room where works are to take place
  • Testing & commissioning including heat load test
  • Associated BMS upgrade works to cooling units & fire systems
Electrical Scope of Works
  • Installation of new free-issue DC power plant (Eaton Electric) in ground floor battery room
  • Installation of free issue battery cells and links into battery cabinets
  • Installation of new DC changeover panel in ground floor battery room to feed new DC power plant
  • Provision of 3x new 200kW UPS modules (Vertiv) in first floor power room including installation of free issue battery cells onto battery stands
  • Existing TSSB breaker upgrades to derive new power supplies to UPS & DC power plant distribution equipment
  • Factory witness test of switchgear