- Installation of 2x new Vertiv chilled water cooling units
- Provision of 3x EC fan upgrades to existing cooling units in perimeter plant corridor
- Install new Vesda air sampling pipework to 2x new RACU’s
- Re-instate chilled water pipework to existing RACU including pipework freezing of existing ring main
- New stainless steel chilled water pipework to new cooling units
- Thermal insulation to chilled water pipework
- Modification to existing water leak detection system to pick up new cooling units in plant corridor
- Installation of black powder coated cable tray containment system in switch room floor void to feed DC distribution cabinets
- Builders work holes for pipework cabling & containment including firestopping
- Re-decoration of walls in power room & switch room where works are to take place
- Testing & commissioning including heat load test
- Associated BMS upgrade works to cooling units & fire systems