Leisure & Retail Facilities

Center Parcs, Sherwood

25 metres of twists and turns with gravity-defying drops throughout.

This project comprises the addition of the third Tropical Cyclone Water Ride at the Sherwood Forest complex.

The ride has 125 metres of twists and turns with the rider experiencing gravity-defying drops throughout.

DBS were involved in the construction of a new ride tower along with the refurbishment of the existing changing area and associated facilities.

Imagery © DBS

Client:Center Parcs
Contractor:SDC
M&E Value:£1.1 Million
Completion Date:June 2020
Mechanical Scope of Works
  • BMS
  • Air Conditioning
  • Insulation
  • Underfloor Heating
  • Sanitaryware
  • Sprinkler System
  • Commissioning
Electrical Scope of Works
  • PA System
  • Sound System
  • Lightning Protection
  • Structured Cabling