- BMS
- Air Conditioning
- Insulation
- Underfloor Heating
- Sanitaryware
- Sprinkler System
- Commissioning
This project comprises the addition of the third Tropical Cyclone Water Ride at the Sherwood Forest complex.
The ride has 125 metres of twists and turns with the rider experiencing gravity-defying drops throughout.
DBS were involved in the construction of a new ride tower along with the refurbishment of the existing changing area and associated facilities.
Imagery © DBS