Educational Facilities

Wren Academy

A 9,590m² Secondary School with separate Community Hub. The main building is set over three floors with teaching spaces to all floors, with the main hall, kitchen and dining hall on the ground floor.

The school also has a separate sports hall which also has teaching spaces and can be used as a separate Community Hub.

DBS undertook the design and installation of the complete MEP Solution for the school.

Imagery © Bowmer + Kirkland

Client:ESFA
Contractor:Bowmer + Kirkland
M&E Value:£5.1 Million
Completion Date:November 2022
Mechanical Scope of Works
  • Domestic services installation
  • Gas fired plantroom installation
  • LPHW installation
  • Sanitaryware supply and installation
  • Air conditioning
  • BMS controls
  • External services
  • Fume extract
  • Flues
  • Thermal insulation
  • Ventilation
  • Water treatment and commissioning
Electrical Scope of Works
  • Lighting and power installation
  • Structured cabling
  • Electric vehicle charging
  • Fire and security
  • Intruder and access control
  • Back-up generator
  • Lightning Protection
  • Photovoltaics
  • Stage lighting